Freight from Porto Velho (RO) to Rio Branco (AC)

Distance, minimum transit time, state lines, and the ANTT minimum rate for each set (Porto Velho (RO)–Rio Branco (AC)), calculated by the same engine that quotes the shipment price on the map.

510 km · 1 state line · direct
Full truckload · freight and fee general cargo · 5-axle LS semi-trailer, up to 27 t
R$5,203
Carrier getsR$4,960
Lillyfrete fee · 4.9%R$243
Refrigerated · freight and feerefrigerated · 5-axle LS semi-trailerR$6,105
Distance
510 kmDistance measured on the road, end to end.
Minimum transit time
9 hunder Law 13.103/2015: a 60 km/h average, the breaks and 11 h of rest in every 24
State lines
1RO → AC
Toll voucher
R$20Estimate for 5-axle trucks, paid separately in advance by the shipper: by law, it is not included in the freight charge

Guide price, excluding ICMS: the bids set the price.

Distances are measured based on the platform’s network, via the fastest route, using the same calculation as the map.

ANTT floor on this route

The minimum the law requires for this haul, by rig and by cargo type (ANTT Resolution No. 6.084 of July 16, 2026). No load is contracted on Lillyfrete below it. The floor covers the cost of running — no profit, tax or tolls — so the market rate sits above it.

RigGeneral cargoDry bulkLiquid bulkRefrigerated or heatedContainerizedNeo-bulk
Van · 2 axlesR$2,483R$2,508R$2,558R$2,922—R$2,290
VUC (urban light truck) · 2 axlesR$2,483R$2,508R$2,558R$2,922—R$2,290
3/4 light truck · 2 axlesR$2,483R$2,508R$2,558R$2,922—R$2,290
Toco (rigid truck) · 2 axlesR$2,483R$2,508R$2,558R$2,922—R$2,290
Truck (rigid, tandem axle) · 3 axlesR$3,142R$3,172R$3,238R$3,692R$5,547R$3,141
Semi-trailer · 4 axlesR$3,538R$3,562R$3,665R$4,188R$6,198R$3,560
LS semi-trailer · 5 axlesR$4,061R$4,081R$4,195R$4,770R$7,144R$4,061
LS semi-trailer · 6 axlesR$4,423R$4,446R$4,564R$5,193R$7,829R$4,423
B-double (bitrem) · 7 axlesR$4,959R$4,927R$5,018R$5,873R$8,702R$4,959
Road train (rodotrem) · 9 axlesR$5,597R$5,613R$5,720R$6,620R$9,836R$5,597

Containerized shipments already include the empty return trip: 92% of the CCD (cost per kilometer) applied to the return distance (Res. ANTT 5.867/2020, art. 3º, § 4º). If the shipment requires a dedicated fleet, the law requires the return trip to be included as well; the listing asks for this information.

— That means the ANTT rate schedule does not include this combination for this type of shipment.

Are you a carrier?

Open loads are listed on the board, each with its own floor. You submit your bid—never below that floor—and only after it has been verified.

See the open loads