Freight from Petrolina (PE) to Aracaju (SE)

Distance, minimum transit time, state lines, and the ANTT minimum rate for each set (Petrolina (PE)–Aracaju (SE)), calculated by the same engine that quotes the shipment price on the map.

480 km · 2 state lines · via Uauá, Carira
Full truckload · freight and fee general cargo · 5-axle LS semi-trailer, up to 27 t
R$4,553
Carrier getsR$4,340
Lillyfrete fee · 4.9%R$213
Refrigerated · freight and feerefrigerated · 5-axle LS semi-trailerR$5,350
Distance
480 kmDistance measured on the road, end to end.
Minimum transit time
9 hunder Law 13.103/2015: a 60 km/h average, the breaks and 11 h of rest in every 24
State lines
2PE → BA → SE
Toll voucher
R$50Estimate for 5-axle trucks, paid separately in advance by the shipper: by law, it is not included in the freight charge

Guide price, excluding ICMS: the bids set the price.

Distances are measured based on the platform’s network, via the fastest route, using the same calculation as the map.

ANTT floor on this route

The minimum the law requires for this haul, by rig and by cargo type (ANTT Resolution No. 6.084 of July 16, 2026). No load is contracted on Lillyfrete below it. The floor covers the cost of running — no profit, tax or tolls — so the market rate sits above it.

RigGeneral cargoDry bulkLiquid bulkRefrigerated or heatedContainerizedNeo-bulk
Van · 2 axlesR$2,372R$2,396R$2,443R$2,791—R$2,189
VUC (urban light truck) · 2 axlesR$2,372R$2,396R$2,443R$2,791—R$2,189
3/4 light truck · 2 axlesR$2,372R$2,396R$2,443R$2,791—R$2,189
Toco (rigid truck) · 2 axlesR$2,372R$2,396R$2,443R$2,791—R$2,189
Truck (rigid, tandem axle) · 3 axlesR$2,999R$3,028R$3,091R$3,523R$5,273R$2,998
Semi-trailer · 4 axlesR$3,376R$3,399R$3,498R$3,996R$5,889R$3,397
LS semi-trailer · 5 axlesR$3,874R$3,894R$4,003R$4,550R$6,788R$3,874
LS semi-trailer · 6 axlesR$4,217R$4,240R$4,353R$4,950R$7,435R$4,217
B-double (bitrem) · 7 axlesR$4,733R$4,702R$4,789R$5,605R$8,269R$4,733
Road train (rodotrem) · 9 axlesR$5,340R$5,355R$5,457R$6,315R$9,345R$5,340

Containerized shipments already include the empty return trip: 92% of the CCD (cost per kilometer) applied to the return distance (Res. ANTT 5.867/2020, art. 3º, § 4º). If the shipment requires a dedicated fleet, the law requires the return trip to be included as well; the listing asks for this information.

— That means the ANTT rate schedule does not include this combination for this type of shipment.

Are you a carrier?

Open loads are listed on the board, each with its own floor. You submit your bid—never below that floor—and only after it has been verified.

See the open loads